Thin Layer Capping and Long Term Environmental Monitoring – A Design Plan Marathon Environmental Remediation Marathon, Ontario

Authors: Wilson, D.

Year: 2012

Reference: Wilson, D. (2012) Presentation “Thin Layer Capping and Long Term Environmental Monitoring – A Design Plan Marathon Environmental Remediation Marathon, Ontario”.

Summary: The design of a thin-layer cap for remediation of mercury and PCB contaminated sediments is covered. Emphasis is placed on the geotechnical aspects of the cap design.

What You Will Find Here:

Link: http://www.rpic-ibic.ca/documents/2012_fcs_presentations/Wilson_E.pdf